Road Closure Map – June 2022

June 9th 2022 Update

  • Road at section 3a is now closed for duct installation until mid July (subject to speed of construction), access for residents and businesses within closed sections will be maintained by our contractor Jones Bros.
  • Residents and businesses on South Stack Road to the north of section 3a should use the signposted diversion through Holyhead. Those to the south of section 3a can continue to be accessed from the Trearddur Bay direction.
  • The ongoing HDD works in section 6a do not require road closure.
  • Ducting installation at sections 3b, 5c, 6 and through the leisure centre car park are complete (green labels on the drawing).
  • We apologise for any inconvenience during the works.